Under the RCRA generator categories adopted in Utah, a facility that generates less than 100 kilograms of hazardous waste in a calendar month is classified as which type of generator?
A. Small Quantity Generator (SQG)
B. Large Quantity Generator (LQG)
C. Conditionally Exempt Generator (CEG)
D. Very Small Quantity Generator (VSQG)
Source: 40 CFR 262.13; Utah Admin. Code R315-262-10
A Utah facility generates 450 kilograms of non-acute hazardous waste in a given calendar month. Which generator category applies for that month?
A. Small Quantity Generator
B. Universal Waste Handler
C. Large Quantity Generator
D. Very Small Quantity Generator
Source: 40 CFR 262.13; Utah Admin. Code R315-262-10
Absent a permit or interim status, how many days may a Large Quantity Generator in Utah accumulate hazardous waste on-site before it must be shipped off-site?
A. 365 days
B. 90 days
C. 270 days
D. 180 days
Source: 40 CFR 262.17; Utah Admin. Code R315-262-17
A Utah Small Quantity Generator must ship its hazardous waste more than 200 miles to reach a designated management facility. What is the maximum on-site accumulation time this SQG may use?
A. 365 days
B. 180 days
C. 270 days
D. 90 days
Source: 40 CFR 262.16; Utah Admin. Code R315-262-16
What is the maximum amount of hazardous waste a Very Small Quantity Generator may have accumulated on-site at any time and still remain eligible for the VSQG conditional exemption?
A. There is no on-site accumulation limit for a VSQG
B. 6,000 kilograms
C. 100 kilograms
D. 1,000 kilograms
Source: 40 CFR 262.14; Utah Admin. Code R315-262-14