Transportation70+AK/AL/AR +moreConstruction & Safety39+CAEnvironmental99+AL/AR/AZ +moreHealthcare & Clinical196+AL/AR/AZ +moreProfessional Licensing307+AL/AR/AZ +moreEducation & Teacher Certification24+CAAviation & FAA Certification9Finance & Securities Licensing23IT & Cloud Certification6Project Management1Military Entrance Testing1View all sectors โ€บ

Free Tennessee RCRA Practice Test Online

Official exam: EPA RCRA Hazardous Waste Generator (TN)

Take a free Tennessee RCRA practice test online: a full 30-question paper with every answer explained, no sign-up, scored by topic. The full 30-question bank and the timed simulator are $14.99 for 30 days.

First published: September 2, 2026Bank updated: September 2, 2026Published by CertQuestUSA ยท review process
TL;DR

EPA RCRA Hazardous Waste Generator (TN): a 30-question practice bank for the real EPA Environmental standard, 3 full papers of 30 questions each with no repeats, every question written to the regulation it comes from.

Where these questions come from

Every question in this bank cites a source -- primarily 40 CFR (100%) of this exam's citations.

Take a full practice test free. 30 real questions built to the exam's domain weights, every answer explained, no sign-up required, with a domain-by-domain score at the end.
Start diagnostic
Want the whole bank for EPA RCRA Hazardous Waste Generator (TN)? One payment of $14.99 gives you 30 days of full access to this exam. It does not renew. No account needed to buy, and there is a 7-day money-back guarantee.
Not ready yet? Take the free practice test first.
Ways to pay for the full bank
30-day pass
$14.99
about $15 a month
This exam only. Pays once, does not renew.
Monthly
$19.99
$19.99 a month
Every exam. Cancel any time.
Yearly
$143.93
about $11.99 a month
Every exam. Billed once a year.
Lifetime
$39.99
pay once
This exam only, no time limit.

See all plans and bundles

3
full papers, no repeats
30
questions per paper
30
questions in the bank
What this exam covers
5 real sample questions
A manufacturing facility generates 150 kilograms of spent solvent contaminated with lead per month. Based on federal RCRA standards, how should this facility classify itself for generator status?
A. Large quantity generator (LQG)
B. Conditionally exempt small quantity generator (CESQG)
C. Very small quantity generator (VSQG)
D. Small quantity generator (SQG)
Show answer and reasoning

Correct answer: D. Small quantity generator (SQG)

SQGs generate between 100 and 1,000 kg/month of hazardous waste; this facility falls in this range.

  • A: LQGs generate 1,000 kg or more of hazardous waste per month; 150 kg/month does not reach this level.
  • B: CEQGs must generate less than 100 kg/month of hazardous waste, and 150 kg/month exceeds this threshold.
  • C: VSQGs generate less than 1,000 kg/month but the facility exceeds the CESQG threshold without meeting LQG criteria.
Source: 40 CFR 262.12
A very small quantity generator (VSQG) of hazardous waste must accumulate hazardous waste for no longer than what time period before it must be removed from the site?
A. 90 days
B. 180 days
C. 30 days
D. 60 days
Show answer and reasoning

Correct answer: A. 90 days

VSQGs may accumulate hazardous waste onsite for up to 180 days before removal per 40 CFR 262.14.

  • B: This exceeds standard federal accumulation periods; generators must comply with specific time limits.
  • C: 30 days is the limit for satellite accumulation areas under certain conditions, not the overall VSQG limit.
  • D: 60 days is the standard for SQG accumulation areas at the point of generation.
Source: 40 CFR 262.41
Under federal RCRA regulations, a generator must use an EPA hazardous waste manifest when transporting hazardous waste to which of the following facilities?
A. To hazardous waste treatment, storage, or disposal facilities (TSDFs)
B. Only when the facility is located out of state
C. Only to hazardous waste treatment and disposal facilities
D. Only to hazardous waste storage facilities
Show answer and reasoning

Correct answer: A. To hazardous waste treatment, storage, or disposal facilities (TSDFs)

40 CFR 262.20 requires manifests for all offsite shipments of hazardous waste to TSDFs regardless of state jurisdiction.

  • B: Manifests are required for both in-state and out-of-state TSDF shipments.
  • C: Manifests are required for all TSDF shipments, not limited to treatment and disposal only.
  • D: Manifests are required when shipping to any permitted TSDF, including storage-only facilities.
Source: 40 CFR 262.20
A waste is identified as a hazardous waste if it meets any of the following criteria EXCEPT:
A. It was generated by a facility that is registered as an SQG or LQG
B. It is listed in 40 CFR Part 261
C. It exhibits one of the four hazardous characteristics (ignitability, corrosivity, reactivity, or toxicity)
D. It is derived from a hazardous waste listed in 40 CFR Part 261
Show answer and reasoning

Correct answer: A. It was generated by a facility that is registered as an SQG or LQG

Generator classification does not determine hazardous waste status; waste properties do.

  • B: Listed wastes per 40 CFR Part 261 Subparts D and E are classified as hazardous.
  • C: Characteristic hazardous wastes are identified by the four hazard characteristics defined in 40 CFR 261.20-261.24.
  • D: Derived-from rule wastes retain hazardous status; they remain hazardous until delisted.
Source: 40 CFR 261.3
An SQG must label each container or tank holding hazardous waste with which of the following information?
A. The words HAZARDOUS WASTE and the date accumulation began
B. The generator's name, EPA ID number, and the hazard class
C. Only the date the waste was generated
D. Only the chemical name of the waste
Show answer and reasoning

Correct answer: A. The words HAZARDOUS WASTE and the date accumulation began

40 CFR 262.34 requires containers be labeled with HAZARDOUS WASTE and the accumulation start date.

  • B: While some information may be helpful, the specific requirements per 40 CFR do not mandate all these elements on each container.
  • C: Date of generation alone is insufficient; the accumulation start date is required.
  • D: Chemical name alone does not meet federal labeling requirements.
Source: 40 CFR 262.34
Same exam, other states
ALARAZCACOCTFLGAIAILINKSKYLAMAMDMIMNMOMSNCNJNMNVNYOHOKORPASCTXUTVAWAWI
Real-world data for this exam
Hazardous Materials Removal Workers: real median wage (TN)May 2025$60,090/yr

Frequently asked questions

Where can I take a free Tennessee RCRA practice test online?
Right here. CertQuestUSA's free Tennessee RCRA practice test online is a full 30-question practice paper built to the real exam's domain weights, with every answer explained, with no sign-up and no credit card, and shows your score by topic at the end. The full 30-question bank, with every answer explained and cited to the regulation it comes from, is $14.99 for a 30-day pass that never renews.
How many questions are on the CertQuestUSA EPA RCRA Hazardous Waste Generator (TN) practice test?
30 questions total, split into 3 full papers of 30 each with no repeats across papers.
What topics does the EPA RCRA Hazardous Waste Generator (TN) test cover?
6 domains, with the heaviest weight on Hazard Waste Identification (27%), Generator Classification (20%), and Manifest Requirements (20%).
Where do CertQuestUSA's EPA RCRA Hazardous Waste Generator (TN) questions come from?
Primarily 40 CFR (100%) of this bank's citations -- computed directly from this exam's own question sources, not a generic description.
Is there a free EPA RCRA Hazardous Waste Generator (TN) practice test?
Yes -- one full 30-question practice paper built to the exam's domain weights, free with no sign-up, with every answer explained and a domain-by-domain score at the end.
Need the certificate itself, not just the practice?
This page is a practice test. Certified Training USA, our sister site, sells the RCRA Hazardous Waste Generator Training course with a certificate of completion.
See the course
Composing your paper...