Take a free Oregon RCRA practice test online: a full 22-question paper with every answer explained, no sign-up, scored by topic. The full 22-question bank and the timed simulator are $14.99 for 30 days.
EPA RCRA Hazardous Waste Generator (OR): a 22-question practice bank for the real EPA Environmental standard, 3 full papers of 22 questions each with no repeats, every question written to the regulation it comes from.
Every question in this bank cites a source -- primarily 40 CFR (50%) and OAR (41%) of this exam's citations.
Correct answer: A. Oregon Department of Environmental Quality (DEQ)
Correct. DEQ's Hazardous Waste Program implements RCRA generator requirements in Oregon under OAR Chapter 340, Divisions 100-120, incorporating the federal regulations at 40 CFR Parts 260-270 by reference along with state-only additions.
Correct answer: B. Very Small Quantity Generator (VSQG)
Correct. Generating 100 kg or less of hazardous waste (and 1 kg or less of acute hazardous waste) per calendar month places a facility in the Very Small Quantity Generator (VSQG) category under 40 CFR 262.13(a), as adopted by Oregon DEQ.
Correct answer: C. Small Quantity Generator (SQG)
Correct. Generating more than 100 kg but less than 1,000 kg of hazardous waste per calendar month places a facility in the Small Quantity Generator (SQG) category under 40 CFR 262.13(b).
Correct answer: D. Large Quantity Generator (LQG)
Correct. Generating 1,000 kg or more of non-acute hazardous waste in a single calendar month classifies the facility as a Large Quantity Generator (LQG) under 40 CFR 262.13(c), the category with the most stringent management standards.
Correct answer: A. Generating up to 1 kg/month of acute hazardous waste can still qualify the facility as a VSQG, but exceeding 1 kg/month of acute waste triggers LQG status
Correct. Under 40 CFR 262.13, a facility may still qualify as a VSQG if it generates 1 kg/month or less of acute hazardous waste (in addition to meeting the non-acute waste limits); generating more than 1 kg/month of acute hazardous waste in a single month makes the facility an LQG for that month regardless of non-acute waste volume.