Take a free Missouri RCRA practice test online: a full 30-question paper with every answer explained, no sign-up, scored by topic. The full 30-question bank and the timed simulator are $14.99 for 30 days.
EPA RCRA Hazardous Waste Generator (MO): a 30-question practice bank for the real EPA Environmental standard, 3 full papers of 30 questions each with no repeats, every question written to the regulation it comes from.
Every question in this bank cites a source -- primarily 40 CFR (70%) and 10 CSR (10%) of this exam's citations.
Correct answer: C. 270 days
40 CFR 262.16 extends the standard 180-day SQG accumulation limit to 270 days when the generator must transport its waste a distance of 200 miles or more.
Correct answer: B. Missouri has been authorized by EPA to administer RCRA under its own state program
Under RCRA, EPA may authorize a state to administer its own hazardous waste program in lieu of the federal program, and Missouri has received this authorization, with the Missouri Department of Natural Resources (MDNR) as the implementing agency.
Correct answer: B. Incorporate and mirror federal 40 CFR standards, with Missouri-specific citations and any state additions
10 CSR 25 incorporates the federal 40 CFR Parts 260-279 framework by reference (with Missouri-specific numbering) and administers it through MDNR, sometimes adding state-specific provisions.
Correct answer: C. Very Small Quantity Generator (VSQG)
Under 40 CFR 262.13, a generator producing under 100 kg of non-acute and under 1 kg of acute hazardous waste per month qualifies as a Very Small Quantity Generator (VSQG).
Correct answer: B. Small Quantity Generator (SQG)
SQGs generate more than 100 kg but less than 1,000 kg of non-acute hazardous waste per calendar month, which fits this facility's 400 kg output.