Take a free Colorado RCRA practice test online: a full 30-question paper with every answer explained, no sign-up, scored by topic. The full 30-question bank and the timed simulator are $14.99 for 30 days.
EPA RCRA Hazardous Waste Generator (CO): a 30-question practice bank for the real EPA Environmental standard, 3 full papers of 30 questions each with no repeats, every question written to the regulation it comes from.
Every question in this bank cites a source -- primarily 40 CFR (70%) and 6 CCR (13%) of this exam's citations.
Correct answer: A. Very Small Quantity Generator (VSQG)
Correct. 40 CFR 262.13 defines a VSQG as generating 100 kg/month or less of hazardous waste and 1 kg/month or less of acute hazardous waste.
Correct answer: B. Small Quantity Generator (SQG)
Correct. SQGs generate more than 100 kg but less than 1,000 kg of hazardous waste per calendar month, which fits 450 kg.
Correct answer: A. 90 days
Correct. 40 CFR 262.17 sets the LQG on-site accumulation time limit at 90 days without a permit.
Correct answer: C. 270 days
Correct. 40 CFR 262.16 extends the SQG accumulation limit to 270 days when the waste must travel more than 200 miles to its designated facility.
Correct answer: A. 55 gallons
Correct. 40 CFR 262.15 caps satellite accumulation at 55 gallons of hazardous waste (or 1 quart of acute hazardous waste) per satellite area before the clock for moving/managing the waste starts.